Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 650 decisions within 5 km, 2 exact-site or onsite candidate records, and 36 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
36 structured nearby appeal records.
36 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Retain single storey extension to the rear of existing dormer style dwelling and retain change of use from single storey garage to domestic use and connection to main house and all associated site works
Construct a two-storey extension to existing dwelling and all associated site works and to retain unauthorised works to include the construction of a detached domestic building used as a garage/store and a study and all associated site works
Construct a dwelling house, domestic garage, wastewater treatment area, bored well, new splayed entrance and all associated site works
Retain the relocation of the septic tank and percolation area (previously granted planning, ref:83-370) and northern and western 1.8m high masonry boundary walls with concrete capping. Permission for new Proprietary treatment system with tertiary coco filter and infiltration bed and all associated site works
Change of use from vacant/agricultural storage to a domestic dwelling which will include the installation a new traditional slates roof over the main body of house, the replacement of an existing dilapidated roof with a new steel corrugated roof, the installation of new structural openings for windows and doors, the installation of a septic tank and percolation area and all associated site works
To construct a slatted cubicle house to include underground slatted slurry storage and feeding apron (2) Roof over existing yard to develop cubicle shed and drafting area. (3) Roof over existing slatted tank. (4)Slatted slurry channel. (5) 2. no silage pits (6) Demolition of disused outbuilding. (7) Alterations to existing entrance along with concrete yards and all ancillary works.
The brief summarizes the pattern across all 650 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 17686The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief