Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,846 decisions within 5 km, 3 exact-site or onsite candidate records, and 173 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
173 structured nearby appeal records.
173 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
1. Provision of extension to the existing hotel building with single storey link building to 4 storey primary care facility of 3,353 sq. metres gross floor area, 2. Associated site works including electricity sub station, new access road from Patrickswell Road (R526) and associated landscape works to include reconfiguration of car parking area and dedication of 120 car parking spaces for Primary Care Use, 3. Change of use of existing ground floor conference center (Part) to new use as Primary Care Centre to include a general medical practice clinic, consultation rooms, admin areas, treatment areas & pharmacy
The construction of a single storey extension to the side of the dwelling house and all ancillary site works
The installation of 857 sq. m. of solar panels on the roof of the existing building and all associated works. The application relates to 'relevant solar energy development' RED III development
The construction of 2 no. off-road parking spaces, widen existing front entrance and dish section of the existing public footpath
Development that will consist of: (1) The partial demolition of 1895sq.m of a building currently in use as the South Court Hotel and the construction of a 6 no. storey, 2 no. basement (a total of 8 levels) mixed use development on a 0.935ha site, which will be comprised of the following: (a) 84 no. residential apartments comprised of: (i) 42 no. 1 bed apartments; (ii) 39 no. 2 bed apartments; (iii) 3 no. 3 bed apartments. (b) 1 no. Childcare facility (139 m²) and as well as dedicated secure open space (111.35 m²); (c) The provision of internal residential amenity areas (330 sq.m) at first floor level which includes a gym and library; (d) 2 no. retail units (Unit A: 1602 m², Unit B: 45m²) with customer and staff carparking (2687m²); (2) The development of a new 1 no. storey & 1 no. basement ‘Hotel Link’ between the South Court Hotel and the proposed mixed-use development (870sq. m.) to include hotel reception, café and seating area, commercial kitchen, staff welfare facilities and an extension to the existing ‘Cream Room’ Bar (107 m²); (3) The provision of 149 no. car parking spaces (79 no. residential spaces at basement level with 70 no. customer spaces provided at lower ground floor level); (4) The provision of bike parking for 170 no. residential and customer bicycles with additional secured staff bicycle parking facilities located at lower ground floor level; (5) The provision of site landscaping (1343 sq.m) which includes communal open space and play equipment; (6) Road upgrades to the existing site entrance and upgrades to the footpath along the R510, R526 and upgrades to the existing surface car parking on the northern portion of the subject site; (6) Erection of signage on building façade (43.2 sq.m); (8) All ancillary site development works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
Construction of a first floor extension over side annex to gable of existing dwelling and associated site works
The brief summarizes the pattern across all 1,846 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 181177The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief