Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 352 decisions within 5 km, 6 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A SERIES OF TWO STOREY EXTENSIONS TO THE FRONT AND SIDE OF THE EXISTING CRECHE BUILDING, AND EXTERNAL ALTERATIONS TO THE EXISTING BUILDING
CONSTRUCT A SINGLE STOREY EXTENSION TO THE SIDE REAR OF THE EXISTING CHILDCARE BUILDING COMPRISING OF A NEW TOILET BLOCK
RETAIN FOR THE EXISTING TWO STOREY CRECHE BUILDING WITHIN REVISED BOUNDARIES FOR PERMISSION FOR A PROPOSED NEW CARPARK ALL
(1) Permission to construct a workshop (2) Retention Permission to Retain existing yard, all as part of the existing steel fabrication business.
To construct a covered storage extension area to the existing workshop.
(1) Permission to construct a workshop and extend existing yard. (2) Extend existing workshop on the south elevation. (3) Raise the roof of the existing workshop on the south elevation to match existing roof profile of the main workshop. (4) Provide a roof over the existing concrete yard between the existing workshop and and the proposed new workshop. (5) Remove existing temporary structure to south side of workshop. (6) Retention Permission to Retain existing concrete yard on the south, all as part of the existing steel fabrication business
The brief summarizes the pattern across all 352 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191046The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief