Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 325 decisions within 5 km, 5 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
An ESB single MV substation, switch room, concrete base pad for the transformer at the existing bottling plant
A warehouse extension (rear/southwest) and for alterations to a section of the front façade (northeast), signage and all associated works to the existing bottling plant
Extended operating hours for Line 1 from between 0800 hours and 2400 hours, Monday to Friday to twenty-four hours, seven days a week (including Saturdays, Sundays and public holidays), and extended operating hours for Line 2 from between 0800 hours to 1900 hours to twenty-four hours, seven days a week (including Saturdays, Sundays and public holidays) and all associated works
Demolition of existing outbuildings and the construction of a two-storey extension to the existing single-storey dwelling house, revised vehicular entrance, installation of wastewater treatment unit, polishing filter and all ancillary site works
The construction of a single storey extension to existing dwelling house, installation of a new upgraded domestic waste water treatment system with polishing filter together with all associated site works
Construction of an extension to the side of existing house at first floor level, internal alteration to the first floor layout to provide for additional bedroom, window at the side of the house at ground floor level together with all associated site works
The brief summarizes the pattern across all 325 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191062The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief