Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 998 decisions within 5 km, 8 exact-site or onsite candidate records, and 75 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
75 structured nearby appeal records.
75 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A STAND-ALONE MARRIAGE CEREMONY BUILDING AND CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
(1) Retain 12 no. single storey, 2 person, prefabricated accommodation cabin, in revised location and all associated sites works carried out to facilitate the foregoing development (further to Planning Reg; Ref 24/352), (2) Planning Permission to erect a Bat Roost (as per condition No. 6 of Planning Reg; Ref 24/352).
(1) ERECT 12 NO. SINGLE STOREY, 2 PERSON, PREFABRICATED ACCOMMODATION CABINS (2) CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
(1) CONSTRUCT A STAND-ALONE MARRIAGE CEREMONY BUILDING AND CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
CONSTRUCT AN INTEGRATED CONSTRUCTED WETLAND (ICW) FOR THE SECONDARY AND TERTIARY TREATMENT OF POST-BALANCING TANK WASTEWATER AND ALL ASSOCIATED WORKS.THE ICW WILL INCLUDE FOUR TREATMENT CELLS, CONNECTING PIPEWORK AND A DISCHARGE TO THE RIVER LEE AT THE SOUTH WEST CORNER OF THE SITE. THE PLANNING APPLICATION IS ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)
(1) CONSTRUCT A 3 STOREY EXTENSION TO THE HOTEL CONSISTING OF 36 NO. BEDROOMS, CIRCULATION AND STORAGE SPACES, (2) REMOVAL OF 3 NO. EXISTING BEDROOMS TO ALLOW FOR ACCESS TO THE PROPOSED BEDROOM EXTENSION AND FOR ASSOCIATED ANCILLARY SPACES, (3) CARRY OUT ALL ASSOCIATED SITE WORKS TO FACILITATE THE PROPOSED DEVELOPMENT
The brief summarizes the pattern across all 998 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 191160The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief