Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 182 decisions within 5 km, 1 exact-site or onsite candidate record, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN RECONSTRUCTION WORKS CARRIED OUT TO SMALL ANIMAL PETTING AREA, SHOP/CAFE, ASSOCIATED TOILETS AND CIRCULATION AREA AS CONSTRUCTED
CONSTRUCT A SINGLE STOREY EXTENSION ONTO AN EXISTING DWELLING HOUSE AND ALL SITE DEVELOPMENT WORKS
CONSTRUCT A NEW DWELLING HOUSE WITH ATTACHED CAR PORT, CONNECTION TO A SEPTIC TANK, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
FILL LANDS WITH INERT WASTE SUCH AS CLAY, STONE, SOIL AND CONCRETE (CONSTRUCTION AND DEMOLITION WASTE), ALONG WITH ASSOCIATED SITE WORKS, FOR THE PURPOSE OF LAND RECLAMATION. THE DEVELOPMENT IS A DEVELOPMENT RELATED TO AN ACTIVITY REQUIRING AN APPLICATION FOR A WASTE PERMIT. A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED
Full planning permission to construct a new dwelling house with attached carport, detached garage, install a septic tank and percolation area and all associated site works.
(A) CONSTRUCT A NEW DWELLING HOUSE WITH GARAGE (B) CONSTRUCT A NEW WASTEWATER TREATMENT SYSTEM WITH ALL ASSOCIATED SITE SERVICES
The brief summarizes the pattern across all 182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191215The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief