Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 24 decisions within 5 km, 2 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
THE INSTALLATION OF BATTERY ARRAYS, LOCATED WITHIN CONTAINER UNITS (18 NUMBER UNITS, EACH 30M2 BY C.2.6M TALL), A CONTROL BUILDING (C.160.5M2 BY C.6.4M TALL) AND TRANSFORMER (C.5M TALL). THE DEVELOPMENT WILL INCLUDE FOR ANCILLARY INFRASTRUCTURE INCLUDING SECURITY FENCING, LIGHTING, CCTV, INTERNAL ACCESS ROADS AND DRAINAGE. THE OVERALL DEVELOPMENT SITE IS C.1.6HA. THE APPLICATION INCLUDES A NATURA IMPACT STATEMENT (NIS)
RETAIN AN EXISTING DEVELOPMENT AT THIS SITE. THE DEVELOPMENT CONSISTS OF AN EXISTING 30 METRE HIGH TELECOMMUNICATIONS SUPPORT STRUCTURE CARRYING TELECOMMUNICATIONS EQUIPMENT, TOGETHER WITH EXISTING EQUIPMENT CONTAINER AND ASSOCIATED EQUIPMENT WITHIN A FENCED COMPOUND AS PREVIOUSLY GRANTED UNDER LOCAL AUTHORITY REF. NO. 11/990. THE DEVELOPMENT WILL CONTINUE TO FORM PART OF METEOR MOBILE COMMUNICATIONS LTD EXISTING AND FUTURE TELECOMMUNICATIONS AND BROADBAND NETWORK
Permission for new two storey dwelling with attached garage, sewerage system, site entrance and all associated works.
The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years. The structure will be fixed to ground anchors by stay wires and will include instruments for measuring local climate conditions and all ancillary works.
CONSTRUCT A NEW ON SITE WASTE WATER TREATMENT SYSTEM COMPRISING OF A MECHANICAL AERATION UNIT, INTERMITTENT FILTER, SOIL POLISHING FILTER, TO SERVE AN EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS
Reclamation of land for agricultural use by filling low lying area with imported fill.
The brief summarizes the pattern across all 24 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191325The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief