Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 147 decisions within 5 km, 2 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
FOR COASTAL PROTECTION WORKS AT TRALEE GOLF CLUB. THE WORKS WILL COMPRISE OF THE PROVISION OF NEW ROCK ARMOUR AND REPAIR OF EXISTING ROCK ARMOUR REVETMENT STRUCTURES AT THREE LOCATIONS ON THE COASTLINE OF THE GOLF CLUB LANDS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED
RETAIN AND COMPLETE COASTAL EROSION WORKS ADJACENT HOLES 2 AND 3
THE PROVISION OF NEW ROCK ARMOUR AND REPAIR OF EXISTING ROCK ARMOUR REVETMENT STRUCTURES AT THREE LOCATIONS ON THE COASTLINE. A NATURAL IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND SUBMITTED.
CONSTRUCT (A) DWELLING HOUSE, SERVICED BY A MECHANICAL WASTE WATER TREATMENT SYSTEM AND RAISED SOIL POLISHING FILTER, (B) A NEW VEHICULAR SITE ENTRANCE, (C) ALL ASSOCIATED SITE WORKS
Retention Permission to retain attic conversion including gable windows and velux roof-lights and Planning Permission to decommission the existing septic tank and the installation of a mechanical treatment unit and polishing filter
EXTEND EXISTING UTILITY ROOM TO THE FRONT NORTH EAST WITH A NEW FLAT ROOFED CARPORT WRAPPING AROUND THE NORTH EAST AND EAST SIDE, EXTEND THE EXISTING KITCHEN DINING AREA TO THE EAST AND SOUTH SIDE COMPLETE WITH SOME MINOR CHANGES TO THE ELEVATIONS OF THE EXISTING DWELLING INCLUDING THE REMOVAL OF THE BALCONY ON THE WEST ELEVATION, REMOVE SEMI-CIRCULAR WINDOWS FROM THE FRONT AND REAR ELEVATIONS, FIT NEW FIRST FLOOR WINDOW ON FRONT ELEVATION COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT AND FOR RETENTION PERMISSION TO RETAIN EXISTING DWELLING AS BUILT WITHIN REVISED SITE BOUNDARIES INCLUDING STEEL STORAGE SHED
The brief summarizes the pattern across all 147 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 191326The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.