Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 40 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW DWELLING HOUSE, FORM NEW ENTRANCE, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKS
THE INSTALLATION OF APPROXIMATELY 12.5KM OF 38KV ELECTRICITY TRANSMISSION LINE FROM THE PERMITTED (WIND FARM) SUBSTATION (OFFALY COUNTY COUNCIL PLANNING REGISTER REFERENCE 14/188 & AN BORD PLEANALA REFERENCE PL19.244053) IN THE TOWNLAND OF STONESTOWN, COUNTY OFFALY TO THE EXISTING ELECTRICITY SUBSTATION IN THE TOWNLAND OF CLONDALLOW, COUNTY OFFALY. THE TRANSMISSION LINE WILL COMPRISE APPROXIMATELY 8.5KM OF UNDERGROUND LINE AND APPROXIMATELY 3.7KM OF OVERHEAD LINE. UNDERGROUND INFRASTRUCTURE WILL BE LOCATED WITHIN PRIVATE LANDS AND WITHIN THE PUBLIC ROADS NUMBERED N62, R439 AND THE L70152; WILL BE INSTALLED IN EXCAVATED TRENCHES OF APPROXIMATELY 1.2M IN DEPTH AND WILL INCLUDE ASSOCIATED UNDERGROUND DUCTING, JOINT BAYS, COMMUNICATION CHAMBER BAYS, SHEATH LINK BOXES AND INSPECTION CHAMBERS; DIRECTIONAL DRILLING AT 1 NO. RAILWAY CROSSING ALONG THE N62, AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS. OVERHEAD INFRASTRUCTURE WILL CONSIST OF 3 NO. POWERLINES SUSPENDED FROM WOODEN POLES WITH A MAXIMUM HEIGHT OF 16 METRES, AND ALL ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) / ENVIRONMENTAL IMPACT STATEMENT (EIS) WHICH INCLUDES AN ASSESSMENT OF THE LIKELY IMPACTS OF THE PROPOSED DEVELOPMENT, AS A WHOLE AND IN COMBINATION WITH THE RELEVANT OFF-SITE OR SECONDARY DEVELOPMENTS WHICH WILL OCCUR AS A DIRECT RESULT OF THE PROPOSED DEVELOPMENT, INCLUDING THE WIND FARM DEVELOPMENT PERMITTED PURSUANT TO OFFALY COUNTY COUNCIL PLANNING REGISTER REFERENCE 14/188 & AN BORD PLEANALA REFERENCE PL19.244053
(I) THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; AND (II) PERMISSION TO INCREASE THE HEIGHT OF THE EXISTING METEOROLOGICAL MAST FROM 80 METRES TO A HEIGHT OF 100 METRES. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT
ADDITION & ALTERATIONS TO EXISTING DWELLING HOUSE, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
DOMESTIC GARAGE, FUEL SHED AND ALL ASSOCIATED SITE WORKS AND SERVICES
A TEN YEAR PERMISSION FOR THE ERECTION OF 2 NO. WIND TURBINES, EACH WITH A MAXIMIUM HEIGHT OF UP TO 169 METRES AND ALL ASSOCIATED SITE DEVELOPMENT, ACCESS AND REINSTATEMENT WORKS; INCLUDING TURBINE FOUNDATIONS, HARDSTANDING AREAS, SITE ACCESS TRACKS, THE UPGRADE OF 1 NO. EXISTING SITE ENTRANCE, ELECTRICAL SWITCH ROOM AND UNDERGROUND ELECTRICAL CABLING. THE COMBINED ELECTRICAL CAPACITY OF THE WIND TURBINES SHALL NOT EXCEED 4.98 MEGAWATTS. THE PROPOSED DEVELOPMENT WILL HAVE A 30-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING OF THE WIND TURBINES
The brief summarizes the pattern across all 40 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19485The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief