Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 72 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT 6 SELF CONTAINED ECO PODS, WTIH AMENITY AND SHOWER FACILITY BUILDING WITH CONNECTION TO EXISTING PUBLIC SERVICES, TOGETHER WITH ASSOCIATED SITE WORKS
The development will provide for the upgrade of the Mulranny Wastewater Treatment Plant and will comprise of the demolition of existing redundant structures; construction of a new inlet works; construction of new storm water holding tank complete with internal cleaning system, storm return system, access stairs and platform; construction of new sludge holding tank complete with access stairs and platform; construction of new storm feed pumping station; construction of new kiosk enclosure to house electrical control panel; and all ancillary site works. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
Planning Permission to construct an annex/ granny flat with connection to associated public services together with all ancillary site works
Construct a dwelling house and ancillary siteworks
REFURBISHMENT OF EXISTING DWELLING, CONSTRUCTION OF AN EXTENSION, CONSTRUCTION OF A NEW ENTRANCE PORCH AND CONNECTION TO EXISTING SITE SERVICES AND ALL ASSOCIATED DEVELOPMENT SITE WORKS
Construction of a new dwelling house, domestic garage, connections to public sewer and watermains together with ancillary site development works
The brief summarizes the pattern across all 72 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19768The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief