Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,795 decisions within 5 km, 3 exact-site or onsite candidate records, and 113 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
113 structured nearby appeal records.
113 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development of lands at site known as Waterford North Quays, Dock Road, Ferrybank, Waterford. The application relates to development in Waterford North Quays Strategic Development Zone (SDZ) and is subject to Waterford North Quays Planning Scheme 2018. The proposed development on the 7.8 hectare site comprises a mixed use development of 129,302sqm gross floor area. A ten year permission has been applied for. An EIAR has been submitted with this application.
Development consisting of a mixed use development which will be the first phase of the development of the SDZ lands. The Phase 1 development includes 9 blocks with a total gross floor area (GFA) of 60579sqm (64953sqm including undercroft and basement car parks (4374sqm)). The development involves construction of a podium which establishes new ground/ street formation level which varies from c.4.6mOD to 8.4mOD which connects to the Sustainable Transport Bridge (by WCCC) at the Central Plaza. Provision is made for pedestrian connection from Central Plaza to Dock Road via the approved pedestrian bridge (by WCCC). A new riverside promenade / cycleway (part of Greenway) is proposed between the Sustainable Transport Bridge and the Eastern Access to the site. (See detailed description attached to Cover Letter)
A change of use planning permission from a café/restaurant to a restaurant/takeaway including all minor internal modifications and all associated works
Development consisting of the erection of a new 1.8m gate and boundary railings to the top of existing alleyway stairs between unit 3 and unit 4 at
Indefinite retention of attic level window to the rear of
To construct a new single storey flat roof extension to the front of the existing dwelling, together with new stepped access to front of dwelling, a new single storey extension to the rear, with a small flat roof extension at 1st floor level at rear of dwelling, elevational alterations & all associated site development works at
The brief summarizes the pattern across all 1,795 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19928The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief