Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 169 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Mayo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Mayo County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Mayo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedCitations are current-dated and carry policy name, section, page and source URL from the Mayo County Council development plan.
1 matchedOpen preview
Open preview
RETENTION FOR THE ERECTION OF A PREFABRICATED STRUCTURE (84SQM) FOR USE AS A TEMPORARY CLASSROOM, FULL PLANNING PERMISSION FOR THE CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION (278SQM) CONSISTING OF 2 NO. CLASSROOMS AND 1 NO. MULTI PURPOSE RESOURCE ROOM, ALTERATIONS OF INTERNAL LAYOUT OF EXISTING SCHOOL BUILDING AND THE INSTALLATION OF A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH NEW BOUNDARY TREATMENTS AND ALL ASSOCIATED SITE WORKS
Retain existing mobile home on site and construct new dwelling house, proprietary effluent treatment system, percolation area including all ancillary site works
RETENTION OF EXISTING GROUNDWORK AND COMPLETION OF DWELLING HOUSE. RETENTION OF EXISTING GRANNY FLAT WITH NEW WASTEWATER TREATMENT SYSTEM AND SOIL POLISHING FILTER. INCLUDING RETENTION OF ALL OTHER ASSOCIATED WORKS AND SERVICES.
1. Demolish existing dwelling house 2. Construct new Dwelling House 3. All ancillary services associated with the development
EXTEND AND RECONSTRUCT DWELLING HOUSE INCLUDING ALL ANCILLARY SITE WORKS.
DEMOLITION OF PART OF EXISTING DWELLING HOUSE AND OUTBUILDING, CONSTRUCTION OF EXTENSION TO REAR OF DWELLING HOUSE TO INCORPORATE EXISTING OUTBUILDING AS LIVING ACCOMMODATION, CONSTRUCTION OF A FIRST FLOOR LEVEL TO EXISTING OUTBUILDING TO ACCOMMODATE HABITABLE ROOMS TOGETHER WITH ALTERATIONS TO ALL ELEVATIONS, REPLACEMENT OF EXISTING SEPTIC TANK WITH NEW PROPRIETARY TREATMENT UNIT AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 169 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19967The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief