Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 120 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A 30 METRE MULTI-USER LATTICE TOWER TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4 METRE HIGH PALISADE FENCE COMPOUND WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS INCLUDING NEW ACCESS TRACK
CONSTRUCT NEW EXTENSION TO EXISTING SCHOOL BUILDING COMPLETE WITH ALL ASSOCIATED SITE WORKS.
Planning Permission for development consisting of construction of a new slatted shed and underground slurry storage tank along with all associated site works There will be one building and all effluent will be collected and stored in the proposed/existing slatted tanks. The slatted shed will be 6.464m in height and is going to be constructed in an existing farmyard our clients family have been farming in for years.
CONSTRUCT DWELLING HOUSE, GARAGE, SEPTIC TANK AND PERCOLATION AREA, COMPLETE WITH ALL ASSOCIATED WORKS
UPGRADING OF WASTE WATER TREATMENT SYSTEM TO PROPRIETARY EFFLUENT TREATMENT SYSTEM ALONG WITH ANCILLARY SITE WORKS
CONSTRUCT DWELLING HOUSE, GARAGE AND TERTIARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
The brief summarizes the pattern across all 120 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201025The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief