Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 169 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLISH AN EXISTING BUILDING AND TO CONSTRUCT A DETACHED, SINGLE STOREY DWELLING HOUSE, INCLUDING DETACHED GARAGE BUILDING AND INCLUDING ALL ASSOCIATED SERVICES AND ANCILLARY SITE WORKS
CONSTRUCT AN EXTENSION TO THE EXISTING SCHOOL COMPRISING OF ONE CLASSROOM WITH ENSUITE TOILET AND ALL ANCILLARY SITE WORKS
BUILD A PRIVATE SINGLE STOREY DWELING AND GARAGE WITH CONNECTION TO EXISTING PUBLIC SEWER AND ALL ASSOCIATED SITE WORKS
DEMOLISH EXISTING OUTHOUSES, ALTER AND EXTEND DWELLING HOUSE AND ERECT NEW GARAGE WITH ALL ASSICATED SITE WORK
BUILD A PRIVATE SINGLE STOREY EXTENSION WITH ATTIC DEVELOPMENT TO BE USED AS A SECOND FAMILY UNIT, TO DECOMMISSION EXISTING SEPTIC TANK SYSTEM ON SITE AND INSTALL A NEW WASTEWATER TREATMENT SYSTEM AND ALL NECESSARY SITE WORKS
CONSTRUCT A BIOGAS PRODUCTION PLANT INCORPORATING: TWO DIGESTION TANKS, A PRE-MIX TANK AND DIGESTATE TANK, A SUBSTRATE STORAGE AREA AND SLURRY STORAGE TANK WITH ASSOCIATED PUMPS, TO CONSTRUCT A BUILDING CONTAINING CHP UNIT AND CONTROLS FOR DIGESTION FACILITY AND MACHINERY STORAGE, A CONCRETE UNDERGROUND COVERED SOILED WATER TANK WITH WHEEL WASH, WEIGHBRIDGE, AND BIOGAS FARE UNIT, TO CONSTRUCT A WATER ATTENUATION TANK FOR STORM/RAIN WATER ON SITE, COMPLETE WITH CLASS 1 OIL INTERCEPTOR/SEPARATOR, SILT TRAPS, TREE LINED BOUNDARY FENCE ON EARTHEN BANK AND ALL SSSOCIATED SITE WORKS
The brief summarizes the pattern across all 169 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief