Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 198 decisions within 5 km, 5 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an extension to existing warehouse/office building for warehouse storage purposes and all ancillary works
Proposed construction of a creep feed plant together with the proposed construction of a grain store both of which are to service the existing onsite feed production mill buildings and all ancillary works
And completion of an existing partially constructed tank bund structure to the side of existing feed production mill building and all ancillary works
Proposed construction of a feed bagging facility building which will adjoin an existing feed storage building and all ancillary works
(a) the recently constructed Mill Production Facility as constructed & which was previously granted full Planning Permission under Planning Reference Number PL15/115 (b) the existing onsite bored well which is currently being used as a potable water supply for the existing Mill Production Facility & all associated office buildings (c) the recently installed onsite proprietary wastewater treatment system with associated polishing filter to service the existing Mill Production Facility & all associated office buildings and all ancillary works
Of PL17/288 proposed construction of an extension to existing bag store/warehouse and all ancillary works
The brief summarizes the pattern across all 198 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20244The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief