Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 129 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF 2 NO. LIVESTOCK UNDERPASSES UNDER THE L-8042-1 AND L-8044-1 WITH EFFLUENT HOLDING TANKS AND ALL ASSOCIATED SITEWORKS
CONSTRUCTION OF (1) A MILKING PARLOUR INCLUDING DAIRY AND ASSOCIATED STORES, SLATTED COLLECTING YARD, CATTLE HANDLING AREA AND COW DRAFTING AREAS, (2) A SLATTED CUBICLE HOUSE INCLUDING ASSOCIATED UNDERGROUND SLATTED TANKS, (3) AN EXTENSION TO AN EXISTING SILAGE PIT INCLUDING AN EXTENSION TO THE EXISTING SILAGE WALL AND A NEW SILAGE APRON, AND ASSOCIATED ANCILLARY WORKS AND SERVICES
CONSTRUCTION OF A DWELLING, GARAGE, ENTRANCE, WASTE WATER TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.
CONSTRUCTION OF AN ENTRANCE, DWELLING HOUSE, PRIVATE WELL AND DOMESTIC WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA TOGETHER WITH ALL ASSOCIATED SITE WORKS
THE ERECTION OF A DWELLING, GARAGE, ENTRANCE, WELL AND WASTEWATER TREATMENT SYSTEM, INCLUDING ALL ASSOCIATED SITEWORKS
A BUNGALOW, DOMESTIC GARAGE, SEPTIC TANK, PERCOLATION AREA, NEW ENTRANCE, ALL ASSOCIATED AND NECESSARY SITE WORKS
The brief summarizes the pattern across all 129 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20633The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief