Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 83 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) RETENTION PERMISSION TO RETAIN THE PARTIAL DEMOLITION AND RECONSTRUCTION OF DWELING HOUSE AND (B) PERMISSION TO INSTALL A PROPRIETARY WASTEWATER TREATMENT SYSTEM AND SAND POLISHING FILTER AND TO DECOMMISSION EXISTING SEPTIC TANK
To retain his craft workshop as constructed
RETAIN HIS TWO DOMESTIC SHEDS AS CONSTRUCTED
CLOSE EXISTING ENTRANCE TO HIS LAND HOLDING AND TO CREATE A NEW ENTRANCE TO SAME LAND HOLDING AT A DIFFERENT LOCATION
RENOVATE AND EXTEND HIS DWELLING HOUSE, TOGETHER WITH THE REPLACEMENT OF THE EXISTING SEPTIC TANK WITH A TREATMENT UNIT AND RAISED SAND POLISHING FILTER, TO INCLUDE DEMOLITION OF THE EXISTING SHOP AND ASSOCIATED SITE WORKS
CONSTRUCT A SINGLE STOREY DOMESTIC DWELLING HOUSE AND ALL ANCILLARY SITE WORKS, AND TO INSTALL AN IRL 8 TRICEL NOVO WASTEWATER TREATMENT PUMPED UNIT AND SANDCELL TERTIARY TREATMENT SYSTEM ALL
The brief summarizes the pattern across all 83 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2066The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief