Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
15% of nearby decided applications were refused. The site check found 638 decisions within 5 km, 2 exact-site or onsite candidate records, and 179 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
179 structured nearby appeal records.
179 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
Garage and car port as constructed and all ancillary site works
Erect a finger post sign for Wicklow Calf Company
To erect circular slurry storage tank
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.
To erect a 532m2 commercial building comprising a 432m2 manufacturing/industrial unit with an ancillary 100m2 office space along with all associated site development works including storage yard, car parking and connect to the existing services
The brief summarizes the pattern across all 638 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20731The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief