Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 309 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kilkenny County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Kilkenny County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Kilkenny County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedNo current-dated citation is loaded for Kilkenny County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To replace an existing 25m metre monopole telecommunications support structure with a new 36 metre multiuser lattice telecommunications support structure, carrying antenna and dishes and to extend the compound enclosed by 2.4 metre high palisade fence together with associated ground equipment cabinets and associated site works
For alterations, extension and renovation of our existing dwelling including partial demolition of an existing single storey extension and demolition of an existing out building, permission is also sought for a new replacement waste water treatment system plus all associated site works
For a new 228.52m2 single storey three bedroom dwelling, waste water treatment system, a new 140m2 agricultural store, new site entrance plus all associated site works
To construct a single storey 4 bedroom extension to the side of a single storey cottage, a proposed new packaged wastewater treatment system and polishing filter, bored new well, upgrade the existing agricultural entrance to a domestic and an agricultural entrance, upgrade and extend existing lane and all associated site works
For retention of alterations to dwelling house as constructed with increase in floor area, alteration to dwelling location and level on site with site works as constructed
For development consisting of a two-storey dwelling house, waste water treatment system and associated site works
The brief summarizes the pattern across all 309 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20733The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief