Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 260 decisions within 5 km, 1 exact-site or onsite candidate record, and 15 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
15 structured nearby appeal records.
15 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct dwellinghouse, foul sewer treatment system and percolation area, connect to existing bored well plus all ancillary site works
To construct Agricultural Slatted Unit plus all ancillary site works
To demolish existing dwelling plus farm sheds to rear and to construct a new dwelling house, garage, foul sewer treatment system and percolation area plus all ancillary site works
To construct an extension to the side of the existing dwelling house and to construct a detached private garage to the rear of the dwelling house along with all associated site works
To construct a dwelling house, site entrance, private garage and on-site waste water treatment system along with all associated site works and ancillary services
To construct a new dwelling house, access road, wastewater treatment system and other associated site works
The brief summarizes the pattern across all 260 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20909The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief