Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 554 decisions within 5 km, 1 exact-site or onsite candidate record, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A 10 year planning permission for the construction and operation of solar PV panels mounted on metal frames on a site extending to approximately 11.4ha and associated ancillary development including an electrical substation compound, control building (70sq.m), 4 no. inverter units, underground cable ducts, hardstanding area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated enabling works. The proposed development also includes for a cable connection to the national grid. The planning application is accompanied by a Natura Impact Statement
The construction of a vehicular entrance, dwelling house, domestic garage, proprietary waste water treatment system with polishing filter together with all associated site works
Converted attic space to habitable space to existing dwelling house, detached garage and fuel storage shed, entrance wall and entrance including all ancillary site works
Construction of a new loose shed & for the extension of an existing slatted shed with slurry storage
The construction of a new, part single storey and part two storey split level dwelling house including entrance, proprietary treatment plant, soil polishing filter and all associated site works. Works also include for the demolition of two existing agricultural sheds
The construction of a new dwelling to replace an existing substandard dwelling, change of use of the existing substandard dwelling to out-house, new septic tank and percolation area, modifications to existing site entrance and all associated site works
The brief summarizes the pattern across all 554 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 20940The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief