Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 209 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a single storey detached Dwelling, single storey detached Garage, wastewater treatment system and associated percolation area, new site entrance and all associated site works
A single storey detached dwelling, single storey detached garage, wastewater treatment system and associated percolation area, new site entrance and all associated site works
The construction of a new extension to an agricultural shed (circa 445sqm) containing cubicles, associated underground slatted tank and ancillary site works
The installation of 2 no. modular, portable Padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the Padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works
For installation of cattle underpass, a soiled water tank and associated works
To construct a loose house (Cattle Shed) and all ancillary site works
The brief summarizes the pattern across all 209 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211116The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief