Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
24% of nearby decided applications were refused. The site check found 763 decisions within 5 km, 2 exact-site or onsite candidate records, and 268 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
268 structured nearby appeal records.
268 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention permission located at the site to the west of 'Seoidin' & comprise: widening of existing entrance to provide for 2 field gates; part regrading of the land and drainage works; provision of a pebbled surface driveway for agricultural access; provision of a pebbled surface vehicular turning area; provision of a concrete slab; storage of firewood; storage of granite slabs & boulder rock. The proposed development will consist of the construction of a 2 storey dwelling; wastewater treatment system & well; narrowing of existing entrance; realignment of the internal driveway; gate piers and gate; soakaway; drainage channel along the Bridge Road; hard and soft landscaping; & all other associated site works. The proposed development will also include demolition and rebuilding of 1.9 linear metres of the northern boundary wall to 'Bridge Road' in a setback position from its current location in order to improve sightlines.
Dwelling, waste water treatment system, revised entrance and associated works
Alterations and extensions to existing dwelling, with ground floor extensions of 32sqm., to include front porch, side and rear extensions, and also first floor extension to rear of 48sqm. with high level clerestory southwest facing windows over existing ridge level including adjustments to chimney. New detached garden-room to side-rear of 13 sqm. Replacement of existing septic tank with new twin chamber septic tank and intermittent soil polishing filer, and all associated site works.
The repositioning and widening of the existing vehicular entrance to the property along with all site works
New dwelling, upgrading of existing section of laneway to site, new section of laneway to, upgrading existing entrance at public road, wastewater treatment unit, soil polishing filter, new well and associate works
Permission for the retention of a single story games room
The brief summarizes the pattern across all 763 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211272The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief