Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 126 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN (1) AS CONSTRUCTED DWELLING HOUSE, SITE ENTRANCE AND SEPTIC TANK SYSTEM AND (2) ALL BUILDINGS WIHIN REVISED SITE BOUNDARIES
(1) CONSTRUCT SINGLE STOREY EXTENSIONS TO FRONT (SOUTH), REAR (NORTH), AND BOTH SIDES (EAST AND WEST) OF EXISTING DWELLING HOUSE, (2) FORM A DORMER TYPE ROOF PROJECTION TO REAR (NORTH) OF A-TYPE ROOF TO ALLOW FOR CONVERSION OF SECTION OF ATTIC SPACE TO HOME OFFICE, (3) INSTALL SIX NO. VELUX TYPE ROOF LIGHTS TO A-TYPE ROOF, (4) CARRY OUT INTERNAL MODIFICATIONS TO DWELLING HOUSE LAYOUT TO ALLOW FOR NEW CONFIGURATION INCLUDING STAIRS TO SERVE ATTIC HOME OFFICE, (5) CONVERT ATTACHED GARAGE AND LOBBY TO A BEDROOM, (6) NECESSARY EXTERNAL MODIFICATIONS TO SERVE NEW INTERNAL CONFIGURATION INCLUDING THE INSTALLATION OF A WINDOW TO SIDE (WESTERN) ELEVATION AND (7) DECOMMISSION EXISTING SEPTIC TANK SYSTEM ON SITE AND INSTALL A NEW WASTEWATER TREATMENT SYSTEM
Chun seomra gairdín a thógáil agus gach oibreacha suímh riachtanacha a dhéanamh ar an láthair.To build a garden room and undertake all necessary site works at the location.
RETAIN AN EXISTING DWELLING HOUSE AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS SERVING IT ALL WITHIN REVISED SITE BOUNDARIES
Planning permission to demolish an existing single storey dwelling & propose a new single storey replacement dwelling, including new piers to existing site entrance, to decommission existing septic tank system & install a mechanical aeration unit & soil polishing filter & all associated site works.
ALTER AND EXTEND THE EXISTING HOUSE AND ALL ASSOCIATED EXTERNAL WORKS, SERVICING AND LANDSCAPING AND TO DECOMMISSION THE EXISTING SEPTIC TANK AND TO REPLACE ALL AND TO INSTALL A MECHANICAL WASTEWATER TREATMENT PUMPED UNIT WITH SOIL POLISHING FILTER
The brief summarizes the pattern across all 126 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211437The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief