Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 223 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN EXISTING DWELLING HOUSE AND PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ANCILLARY SITE WORKS AND LANDSCAPING AS CONSTRUCTED
(A) RETAIN COTTAGE BUILDING RENOVATIONS AS CONSTRUCTED AND RETAIN CONNECTION OF COTTAGE BUILDING TO EXISTING SEPTIC TANK ON SITE (B) RETENTION PERMISSION TO RETAIN THE CHANGE OF THE USE OF THE EXISTING COTTAGE BUILDING FROM DOMESTIC STORAGE SHED TO SHORT TERM RENTAL COTTAGE (C) AND ALL ASSOCIATED SITE WORKS
Full Planning Permission to construct a new all-weather pitch, ball retention nets, pitch lighting, 2 no. dugouts, pitch surround fencing, car park and all associated site services.
CONSTRUCT A TWO-STOREY STYLE DWELLING SERVICED BY A SEPTIC TANK, PROPRIETARY INTERMITTENT FILTER SYSTEM AND SOIL POLISHING FILTER
(1) CONSTRUCT 1 NR DWELLING HOUSE AND PROPRIETARY TREATMENT UNIT AND INFILTRATION AREA, ALL IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED
CONSTRUCT A NEW DWELLING, PROVISION OF SEPTIC TANK AND PERCOLATION AREA, AND UPGRADE AND CONSTRUCTION OF AN ACCESS ROAD, AND ALL ASSOCIATED SITE SERVICES
The brief summarizes the pattern across all 223 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211442The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief