Permission for the construction of commercial building for warehouse/industrial use (total floor area of 419.350m2) with integral toilet facilities and all associated site development works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Unit 1 Tinure Industrial Estate , Tinure , Co Louth
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
25% of nearby decided applications were refused. The preview found 549 nearby planning records within 5 km where a location match is available.
- Matched source
- 2141
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Permission for the construction of a single storey porch extension to front of existing dwelling.
Permission for proposed single storey extension to rear of existing two storey dwelling house together with associated site works
Development consists of retention of existing detached single storey cabin/structure for residential use.
Permission for a storey and a half extension to the existing shop to provide for increased retail and storage areas, together with a new shop front, signage and all associated site development works
Permission for development to consist of the demolition of existing sunroom of the side of existing dwelling and replace with single storey extension, elevational changes and all associated site development works
The brief summarizes the pattern across all 549 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2141The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief