Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 826 decisions within 5 km, 2 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Sligo County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Sligo County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Sligo County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedNo current-dated citation is loaded for Sligo County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Development consisting of retention of conversion of roof space to living accommodation, 2 dormer windows on front elevation, gable windows (2 No) and a single storey rear extension to dwelling
Development consisting of retention of domestic garage, utility room and home office in a single storey free standing building
For development consisting of the installation of 2 no. 1.65MVA emergency back-up Hydrotreated Vegetable Oil (HVO) generators measuring 6.26m in length, 2.66m in width and 3.39m in height connected to an existing MV switchroom located on existing concrete plinths with associated 1 no. 45,000 litre Fuel Storage Tank located on existing concrete plinth all enclosed in existing security palisade fencing and all ancillary site works with access taken from 3 no. existing access gates
Development consisting of a single storey extension the south east of the existing production facility, with a floor area of 57.5 sq metres, an overall height of 6.7 metres, all associated site works and service connections
For development consisting of the retention of a garage conversion to bedroom ensuite
Development consisting of the construction of a new storage building, with a floor area of 182 sq metres with an overall height of 5.1 metres, the provision of a new door into an existing adjacent building and all associated site works and services connections, all located to the north west of the existing production facility adjacent an existing storage building.
The brief summarizes the pattern across all 826 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21444The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief