Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,631 decisions within 5 km, 7 exact-site or onsite candidate records, and 215 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
215 structured nearby appeal records.
215 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Replacement boundary with security fencing to rear of commercial units 1 to 6A including all ancillary works
The removal of the hedge and the erection of a 2.50m high steel fence along the Ballysimon Road, the installation of a roller shutter door to rear of unit no. 2 and all associated ancillary site development works and Permission to plant a landscape scheme along and to construct modifications to the existing 2.50m high steel fence along the Ballysimon Road, to construct 4 no. Kitchen Hub Unit (total area approx. 370sq.m.) and associated signage, and a vehicle access road, turning area and parking in the forecourt area to Ballysimon Road and all associated ancillary site development works.
Signage and the installation of rear access point for vehicles to industrial unit by means of warehouse door and rear window, including all ancillary works
A high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 8no. electric vehicle charging bays and 4no. charging points (ii) installation of new EV canopy with associated illuminated signage, (iii) new modular ESB Substation, (iv) new EV banner signage, (v) associated revisions to forecourt including new road markings, pedestrian crossing point and 2m high masonry blast wall along northern boundary and, (vi) all other associated site development and drainage works
A pay-to-use waste portable compactor for dry recyclables and a pay-to-use portable waste compactor for residual waste and food waste
1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 19sq.m, 1 no. covered shelter with a floor area of 38sq.m and 38m of 2.6m high boundary wall and associated ground works
The brief summarizes the pattern across all 2,631 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21870The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief