Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 44 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A new longitudinal loading bay adjacent to the North Western side of the existing public road for temporary forest use, the longitudinal loading bay has been designed as per COFORD Forest Road Manual and will comprise clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage and all associated site works
1) a proposed staff welfare compound, consisting of 4 no. 6m x 4m x 3.0m high, prefabricated welfare and administration buildings, a car park area for 5 no. vehicles, 1 no. 1.2m x 1.2m x 3.0m high toilet block with self-contained effluent storage tank approximately 1,500 litres in size, 2) RETENTION PERMISSION for an amended internal site access road layout and hardstanding areas (previously approved under planning reg. ref.: 04/1259) and 3) all associated site ancillary services and works, total development area of approx. 1.8 ha
A new dwelling with garage, entrance, and wastewater treatment system and polishing filter percolation area with all associated siteworks
Further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning permission ref: 12/77 and extended under planning permission ref: 15600530, for the purposes of monitoring wind and climate conditions at Garracummer windfarm granted permission under planning ref: 04/1259 and ABP PL.23.215597
Further continued use of two erected permanent 65m lattice meteorological masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission Ref 15600530 and Planning Permission Ref 18600988 and also Planning Permission Ref 211313 for the purposes of monitoring wind and climate conditions at Garracummer windfarm (granted under Planning Ref 04/1259 and ABP PL.23.215597), at lands at Cummer Beg, Garracummer, Birchgrove, Moanvaun, Curraghmarky & Cummermore, Hollyford, Co. Tipperary. Permission is sought for the further continued use of the permitted meteorological masts for the remaining lifetime of the windfarm
Development at this site consisting of further continued use of two erected permanent 65m lattice meteoroloical masts previously granted under Planning Permission Ref 12/77 and extended under Planning Permission Ref. 15600530 and Planning Permission Ref 18600988 for the purposes of monitoring wind and climate conditions at Garracummer windfarm, granted permission under Planning Ref 04/1259 and ABP PL.23.215597 at lands at
The brief summarizes the pattern across all 44 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21918The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief