Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 159 decisions within 5 km, 2 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEMOLITION OF A NON-HABITABLE HOUSE AND OUTBUILDING, CONSTRUCTION OF A DETACHED DWELLING HOUSE WITH CARPORT, DOMESTIC GARAGE, PROPRIETARY SEWAGE TREATMENT SYSTEM AND ASSOCIATED SITE WORKS
Construct extensions and alterations to the existing dwelling house and to install a new proprietary effluent treatment system and percolation area along with all associated services
CONSTRUCT EXTENSIONS ALTERATIONS AND RENOVATIONS TO EXISTING PRIVATE DWELLING HOUSE AND TO INSTALL AN UPGRADED PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA ALONG WITH ALL ASSOCIATED SERVICES.
CONSTRUCT EXTENSION ALTERATIONS AND RENOVATIONS TO EXISTING DWELLINGHOUSE AND TO INSTALL AN UPGRADED PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA ALONG WITH ALL ASSOCIATED SERVICES
CONSTRUCT WHEELCHAIR ACCESSIBLE BEDROOM AND BATHROOM EXTENSION TO THE SIDE OF THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKS
RETAIN AND COMPLETE THE EXISTING PARTIALLY CONSTRUCTED DWELLINGHOUSE, UPGRADED PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA TO SERVE BOTH THE PARTIALLY CONSTRUCTED DWELLINGHOUSE AND THE EXISTING DWELLINGHOUSE ON THE SITE AS A GRANNY FLAT ASSOCIATED WITH THE PARTIALLY CONSTRUCTED DWELLINGHOUSE, ALL REVISED BOUNDARIES FROM THAT PREVIOUSLY GRANTED UNDER P00/2652 ALONG WITH ALL ASSOCIATED SERVICES
The brief summarizes the pattern across all 159 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21924The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief