Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 265 decisions within 5 km, 3 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The erection of a 30 m high lattice telecommunications support structure together with antennas, dishes and associated equipment all enclosed in security fencing and to remove the existing 12m timber pole telecommunications support structure (overall height 14.5m) at the eir Exchange, Tooreen (Td), Croom, Co Limerick. The proposed development is located within the curtilage of the former railway station for Croom, a Protected Structure
Erection of a 24m high lattice telecommunications support structure together with antennas, dishes and associated equipment all enclosed in security fencing and the removal of the existing 12m timber pole telecommunications support structure (overall height 14.5m). The proposed development is located within the curtilage of the former railway station for Croom, a Protected Structure
The development that consists of an extension to the existing facility consisting of additional light industrial manufacturing area, two storey ancillary office space for staff facilities resulting in additional gross floor area of 3050m2. Other works include a proposed new vehicular entrance to the southeast of the site, relocation of exiting football pitch, the construction of a new car park providing an additional 43no. parking spaces including accessible spaces, EV charging stations, and a set-down area. The provision of 1no. loading bay to the northern elevation, secure bicycle parking spaces, plant and photovoltaic units to the roof level, provision of SuDS measures including swale to northwestern end of site with all ancillary landscaping, associated site works and services. The development will also include works to the existing medical facility northern elevation to facilitate integration with the proposed extension
Over clad the wall & roof areas of the existing two gable roof buildings to the front of the site in a selected insulated metal panel system, to modify the fenestration of the existing facades, to change the colour of the existing 2 storey portal frame building to the rear of the site to match the new over clad structures, to extend the first floor office area by a 52m sq. internal mezzanine area and all ancillary site works & services
Ground floor extension of area 830m2 warehouse, first floor extension to internal mezzanine of area 30m2 office space, alterations to existing facade, external HVAC tanks to the north elevation, 4 no. sheds and alterations to site works including car parking layout
The construction of a three storey 91 No. bed nursing home with area of 4,717 sq.m and 32 No. unit single storey independent living units with overall area of 1936 sq.m for the 32 units (each unit 60.5 sq.m). The Nursing Home includes all associated uses comprising en-suite bedrooms, reception and day rooms, TV rooms, dining rooms, kitchen, treatment rooms and salon, family room, library, administration and office rooms, storage rooms, laundry, staff facilities, plant rooms, service rooms and areas, accessible WCs and circulation areas. Each Independent Living Unit includes a double bedroom, an open plan living / dining / kitchen room, a study, an accessible WC and associated storage and circulation. The works will include all associated landscaping and site works, including standalone service and storage enclosures with area of 83 sq.m comprising electrical sub-station, refuse storage and plant. 93 No. vehicular parking spaces and 20 No. cycle parking spaces will be provided. New vehicular, cycle and pedestrian access is via a new distributor road from St Senan's Terrace
The brief summarizes the pattern across all 265 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221207The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief