Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 103 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
RETAIN (A) CHANGE TO ELEVATIONS, (B) REAR EXTENSION AS CONSTRUCTED OUTSIDE OF THE GRANT OF PLANNING OF 04/887, (C) ALL WITHIN REVISED SITE BOUNDARIES AND (D) ALL ASSOCIATED SITE WORKS
CONSTRUCT 2 NEW CAR SPACES AT THE FRONT OF EACH DWELLING AND ALL ANCILLARY SITE WORKS
DEMOLISH THE FORMER CINEMA BUILDING, REMOVE THE SPOIL AND MAKE GOOD TO THE GROUND SURFACE WITH A GRAVEL FINISH
(A) DEMOLISH WESTERN WALL, ENTRANCE GATES AND SINGLE STOREY ENTRANCE HUT TO SITE, (B) REMOVAL OF PORTACABIN AND CONTAINER, (C) REPLACEMENT ROOF TO EXISTING SINGLE STOREY BUILDING WITH NEW OVERHANG TO CREATE EXTERNAL COVERED AREA, (D) ALTERATIONS TO EXISTING OPES TO FRONT, REAR AND SIDE (EAST) ELEVATIONS OF EXISTING SINGLE STOREY BUILDING, (E) CONSTRUCTION OF SINGLE STOREY EXTENSION TO FRONT AND SIDE (WEST), (F) NEW 2.4M TALL GATES AT EXISTING VEHICULAR ENTRANCE LOCATION, NEW VEHICULAR EXIT WITH 2.4M TALL GATES AND NEW 2.4M TALL PEDESTRIAN GATE, BOTH TO NORTHWEST CORNER OF SITE, AND NEW 2.4M TALL BOUNDARY FENCING TO WESTERN BOUNDARY, (G) CREATION OF 16 CAR PARKING SPACES WITHIN NEW ONE-WAY SYSTEM ACCESS ROAD, (H) NEW WALKING TRACK WITH LOW LEVEL LIGHTING AROUND PERIMETER OF EXISTING PITCH AND (G) ALL ANCILLARY SITE WORKS AT SITE
(A) RETAIN EXISTING HOUSE WITHIN REVISED SITE BOUNDARIES. (B) PERMISSION TO CONSTRUCT A SINGLE STOREY EXTENSION TO SIDE OF EXISTING HOUSE. (C) ALL ASSOCIATED SITE WORKS
DEVELOPMENT CONSISITING OF (A) REINSTATEMENT OF RENDER TO FRONT (SOUTH) ELEVATION (B) ALTERATIONS TO FENESTRATION TO SIDE (EAST) AND REAR ELEVATIONS AT GROUND FLOOR LEVEL (C) CONSTRUCTION OF SINGLE STOREY EXTENSION TO REAR (D) CONVERSION OF REAR ATTIC INCLUDING DORMER EXTENSION TO FRONT AND REAR ROOF PLANES OF REAR ROOF AND ROOF LIGHT TO FRONT (SOUTH) PLANE OF REAR ROOF (E) ROOF LIGHTS TO REAR (NORTH) PLANE OF FRONT ROOF (F) RELOCATION OF EXISTING VEHICULAR GATE TO SIDE (EAST) (G) REMOVAL OF CHIMNEY TO EAST GABLE (H) CONSTRUCTION OF SINGLE STOREY DOMESTIC SHED TO REAR AND (I) ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 103 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221348The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief