Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 774 decisions within 5 km, 2 exact-site or onsite candidate records, and 61 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
61 structured nearby appeal records.
61 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a boundary wall to existing parking area consisting of a 900 mm rendered blockwork wall including concrete cap with 1000mm decorative palisade type railing fixed on top, and the erection of a new security gate at existing property entrance and assoicated site works
The construction of a wholesale warehouse including all associated site development works such as yards, carparking areas, fencing, lighting, drainage and access from the existing Ard Gaoithe Business Park road
The proposed development will consist of the construction of 3 no. warehousing/light industrial units (with a floor area of 1029sqm for building 1, a floor area of 1430 sqm for building 2 and a floor area of 1430 sqm for building 3, parking spaces and all associated services. In addition, Flamewell Limited is to apply for a change of use for the existing 100 square metre cottage, which is a protected structure on the development from domestic to office use. Existing outbuildings and sheds are proposed to be demolished.
A) Single-storey shed on the Western boundary of the rear service yard and all associated site services and site development works
(a)demolition of existing single-storey structure. (b)development of a single- storey extension to the rear of the existing building to provide work shop and equipment maintenance facilities (c) all associated site services and site development works
A) the construction of a single-storey (eaves height 8.255m) Central Utilities Building in the service yard to the rear of the existing building to accommodate plant and equipment, and all associated site services and site development works.
The brief summarizes the pattern across all 774 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22616The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief