Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 191 decisions within 5 km, 4 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A DWELLING HOUSE WITH SEPTIC TANK, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCT A STOREY AND A HALF STYLE DWELLINGHOUSE, WITH A SEPTIC TANK, PERCOLATION AREA, AND ANCILLARY SITE DEVELOPMENT WORKS
RETAIN (A) EXTENSIONS AND RENOVATIONS AS CONSTRUCTED TO THE EXISTING DWELLING AND TO RETAIN THE EXISTING STABLES (B) RETAIN THE HOUSE AND SERVICES WITH ALL ASSOCIATED WORKS WITHIN REVISED SITE BOUNDARIES (C)PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND PERCOLATION AREA( D) PERMISSION TO CONSTRUCT /INSTALL A MECHANICAL TREATMENT UNIT AND POLISHING FILTER WITH ALL ASSOCIATED SITE WORKS
Retention permission to retain the wastewater treatment unit as installed and to retain the site entrance all associated site works all at Ballydwyer East, Ballymacelligott, Co. Kerry
(A) EXTEND THE EXISTING BUILDING TO INCLUDE A CORRIDOR LINK, DISABLED WC/SHOWER, QUIET ROOM AND ACCESS ENTRANCE LOBBY ALL TO THE FRONT ELEVATION (B) MAKE ALTERATIONS TO THE EXISTING SCHOOL BUILDING (C) PROVIDE A DISABLED CAR PARKING SPACE AND LEVEL ACCESS ROUTE TO ENTRANCE VIA EXISTING VEHICULAR ACCESS RAMP (D) AND ALL ASSOCIATED SITE WORKS
CONSTRACT A NEW DWELING HOUSE, DETACHED GARAGE, CAR PORT, CONNECTION TO A MECHANICAL AERATION UNIT POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 191 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22771The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief