Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 1,046 decisions within 5 km, 5 exact-site or onsite candidate records, and 76 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
76 structured nearby appeal records.
76 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(A) TO RETAIN THE EXISTING DWELLING HOUSE CONSTRUCTED WITHIN REVISED SITE BOUNDARIES, (B) PERMISSION TO RETAIN THE EXTENSION AS CONSTRUCTED TO THE SIDE OF EXISTING DWELLING HOUSE AS AN INDEPENDENT SEMIDETACHED DWELLING HOUSE INCLUDING ALL ELEVATIONAL CHANGES. ALSO FULL PLANNING PERMISSION FOR (C) PERMISSION TO DEMOLISH FRONT BOUNDARY WALL TO ALLOW FOR THE CONSTRUCTION OF THREE NEW CAR PARKING SPACES, TWO FOR THE EXISTING DWELLING HOUSE AND ONE FOR THE DWELLING THAT IS TO BE RETAINED, (D) PERMISSION TO CONSTRUCT A NEW REAR BOUNDARY WALL BETWEEN THE PROPERTIES TOGETHER WITH ALL ASSOCIATED ANCILLARY SITE WORKS
CONSTRUCT A TWO STOREY EXTENSION TO THE SIDE OF EXISTING HOUSE
Retention Permission to retain (A) a domestic shed/store/home gym and (B) the raised ground around the building (retaining wall, yard and concrete floor) as well as all associated works
CONSTRUCT A SINGLE STOREY EXTENSION TO THE SIDE OF OUR DWELLING
RETAIN MY EXISITING DWELLING HOUSE AS CONSTRUCTED ON SITE COMPLETE WITH ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT ON MY SITE
(A) RETAIN DORMER WINDOW ON THE SOUTH ELEVATION AND MINOR ELEVATIONAL CHANGES TO THE EXISTING DWELLING AND (B) RETAIN SHED
The brief summarizes the pattern across all 1,046 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 231036The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief