Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 102 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) RETAIN STORAGE BUILDING AS CONSTRUCTED AND (B) RETAIN CHANGE OF USE OF STORAGE BUILDING TO A SHORT TERM LETTING HOLIDAY HOME (C) RETAIN SEPTIC TANK AND PLANNING PERMISSION TO INSTALL A PURAFLO TYPE POLISHING FILTER WITH THREE PODS UNITS
DEVELOP A GLAMPING AREA CONTAINING FIVE PODS SERVED BY AN EFFLUENT TREATMENT TANK AND POLISHING FILTER WITH ASSOCIATED SITE DEVELOPMENT WORKS AND TO INSTALL P.V. PANELS AND TO UPGADE EXISTING FARM ACCESS ROAD AND RETENTION PERMISSION TO RETAIN SPLAYED ENTRANCE TO ACCESS ROAD
CONSTRUCT A DWELLING HOUSE SERVED BY AN EFFLUENT TREATMENT TANK AND POLISHING FILTER
(A) RETAIN EXISTING SLATTED LIVESTOCK UNIT, (B) PLANNING PERMISSION TO DEMOLISH EXISTING OLD MILKING COMPLEX AND (C) CONSTRUCT IN ITS PLACE A NEW EASY FEED SLATTED LIVESTOCK UNIT. THE PROPOSED STRUCTURE TO INCORPORATE ASSOCIATED UNDERGROUND SLURRY STORAGE TANK WITH 2 EXTERNAL AGTATION POINTS. THE ABOVE TO BE CARRIED OUT WITH ALL ASSOCIATED ANCILLARY SITE WORKS
(a) retention permission to retain the demolition of the existing old dwelling house and to retain partially constructed new dwelling house, and (b) permission to demolish the remaining part of the existing old dwelling house, complete the construction of the new dwelling house, and to decommission the existing septic tank and install a new mechanical wastewater treatment system with sand polishing filter, and all associated site works.
CHANGE USE OF HOSTEL TO 6 HOLIDAY HOMES
The brief summarizes the pattern across all 102 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 231194The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief