Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 668 decisions within 5 km, 8 exact-site or onsite candidate records, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To erect three storey over basement apartment block consisting of 28 no. (16 no. 2 beds and 12 no. 1 beds) fully serviced apartments, form site entrance, parking to existing basement and connect to existing public mains water, sewerage and surface water drainage and all ancillary site works. This site is partially developed, the basement is existing and constructed under previously approved planning reference 02991625
Erect fully serviced single storey extension to existing school incorporating 2 no. Autistic Spectrum Disorder classrooms, 1 no. Mainstream Classroom, new link corridor, new office, toilet facilities, boundary treatments, new carparking and set down area, relocation of hard surface play area, alterations to site layout with a new access via service road (Planning Reg No 20/376)
For change of use of existing dwelling to pre/after school care facility with associated alterations to elevations, outdoor play area and pedestrian path access from adjoining Gaelscoil Bhreifne and all associated site works
Make alterations to site layout and boundaries to include for additional parking, also permission sought to increase pupil numbers from 75 to 130, alterations to north-west elevation of previous approved planning (ref 18/551), relocate existing field gate entrance, temporary parking spaces at rear of the school during construction works and all associated site works
To partially demolish existing library to front elevation of existing school building and construct new single storey assembly/sports hall extension and all associated site works
For change of use of existing residential convent building to educational school building with associated alterations to elevations, alterations to site entrance and car parks, new basketball court and recreational areas and all associated site works. Significant further information and revised plans have been submitted
The brief summarizes the pattern across all 668 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23271The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief