Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,105 decisions within 5 km, 8 exact-site or onsite candidate records, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For the following works (A) demolish existing extension to rear of dwelling. (B) demolish existing shed to rear of dwelling. (C) renovate and change layout of the existing dwelling, (D) raise the roof level and construct first floor extension to dwelling. (E) construct single storey extension to rear and side dwelling and (F) use part of the dwelling as a granny flat, all with associated site works
For the following works (A) Demolish existing extension to rear of dwelling. (B) Demolish existing shed to rear of dwelling, (C) Renovate and change layout of the existing dwelling, (D) Raise the roof level and construct first floor extension to dwelling, (E) Construct single storey extension to rear and side of dwelling and (F) use part of the dwelling as a granny flat, all with associated site works
To remove part of existing front boundary wall and to construct vehicular entrance plus all ancillary site works
To construct a detached ancillary living unit to the rear of the existing dwelling, on which the works granted under existing permission P23-593 are presently being carried out, with all associated site works
For the following works (A) Demolish existing flat roof extension, including attached garage to side of dwelling. (B) Demolish sunroom to rear of dwelling. (C) Construct extensions to front, side and rear of dwelling, (D) Construct car-port to side of dwelling, and (E) Use part of the dwelling as a granny flat, all with associated site works
To (a) Retain renovations, alterations and extension to existing dwelling (b) Complete renovations, alterations and extensions, alterations and extension to existing dwelling, together with all ancillary site development works and services
The brief summarizes the pattern across all 1,105 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23579The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief