Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 995 decisions within 5 km, 2 exact-site or onsite candidate records, and 93 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
93 structured nearby appeal records.
93 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a proposed new 92m2 single storey steel framed gymnasium building including all associated drainage, infrastructural and site works. Revised by significant Further Information of works to existing site layout, car parking and existing exit gate.
Extension of Duration of Planning Ref. No. 12/434 - for the construction of a single storey extension to the side of the existing clubhouse building containing 2 no. changing rooms, shower room, disabled W.C. new wastewater treatment unit and percolation area to comply with current EPA guidelines and all associated site and landscaping works
Of an existing 18 metre high telecommunications support structure carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference 09/1038. The development will continue to form part of Meteor Mobile Communications Limited existing and future telecommunications and broadband network at this site
To upgrade existing residential entrance to a recessed entrance all associate site works
A dormer bungalow with separate garage also to include a Balmoral BAP wastewater treatment system and ancillary works
For (1) internal changes to existing layout, (2) attic conversion to accommodate 2 no bedrooms and 1 bathroom, (3) Construct 2 no dormer windows to front elevation, (4) Install 2 no velux windows to rear elevation
The brief summarizes the pattern across all 995 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2360139The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief