Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 99 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a single storey extension to the front of an existing dwelling house, minor elevational changes to the existing house, decommissioning of existing foul water system and installation of a new onsite wastewater treatment system and all ancillary works
CONSTRUCT DWELLING HOUSE AND SHED AND ALL ANCILLARY SITE WORKS AND SERVICES
EXTENSION TO AN EXISTING HOUSE AND ALL ANCILLARY SITE WORKS AND SERVICES
DEMOLISH EXISTING DWELLING HOUSE AND OUTBUILDING, CONSTRUCT REPLACEMENT DWELLING HOUSE, CONSTRUCT DOMESTIC GARAGE, INSTALL EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND CARRY OUT ALL ASSOCIATED ANCILLARY SITE WORKS
RETAIN DWELLING HOUSE, DOMESTIC GARAGE AND STORAGE SHED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES
Installation of a sewage treatment system and percolation and ancillary site development works
The brief summarizes the pattern across all 99 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23656The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief