Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
20% of nearby decided applications were refused. The site check found 104 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(1) DEMOLISH SINGLE STOREY SPLIT LEVEL DETACHED DORMER BUNGALOW AND SINGLE STOREY SHED TO REAR AND SIDE ON WEST BOUNDARY (2) CONSTRUCTION OF A REPLACEMENT HOUSE,SINGLE STOREY TO THE FRONT (SOUTH) AND SIDE (WEST) ELEVATION AND TWO STOREY TO THE SIDE (EAST) AND REAR (NORTH) ELEVATIONS (3) CONSTRUCTION OF SOLAR PANELS AND 5 NO. ROOFLIGHTS TO FRONT ROOFS AND 3 NO. ROOFLIGHTS TO REAR ROOFS (4) CONSTRUCTION OF NEW PEDESTRIAN GATE TO SIDE (WEST) BOUNDARY (5) CONSTRUCTION OF NEW WASTE WATER TREATMENT PLANT TO REPLACE THE EXISTING AND ASSOCIATED DRAINAGE (6) ALL ASSOCIATED LANDSCAPING AND SITE DEVELOPMENT WORKS
RETAIN WORKS CARRIED TO FOR CAMPER VANS/MOTOR HOMES WITH AIRES TYPE ACCOMMODATION CONSISTING OF 12 SPACES AND SITE DEVELOPMENT WORKS
CONSTRUCT A SINGLE STOREY TYPE DWELLING HOUSE C/W SECONDARY TREATMENT UNIT AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS IN ACCORDANCE WITH PLANS AND PARTICULARS SUBMITTED
CONSTRUCT A DWELLING HOUSE C/W SECONDARY TREATMENT UNIT AND SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
(1) TO RENOVATE EXISTING SINGLE STOREY DWELLING, (2) CONSTRUCT SINGLE STOREY EXTENSIONS TO THE SOUTH (SIDE) AND WEST (REAR) OF THE DWELLING, (3) REMOVE EXISTING STEELTECH SHED AND REPLACE WITH A MASONRY BUILT SHED, (4) ALTER EXISTING SITE ACCESS, (5) DECOMMISSION EXISTING FOUL TREATMENT SYSTEM AND INSTALL A NEW PROPRIETARY WASTEWATER TREATMENT SYSTEM, (6) ALL ANCILLARY SITE WORK
CONSTRUCT A DWELLING HOUSE SERVED BY MECHANICAL AERATION UNIT AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 104 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23697The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief