Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 629 decisions within 5 km, 6 exact-site or onsite candidate records, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Will consist of a single storey extension to the side and rear of the existing cottage along with renovations and alterations to the existing cottage, the demolition of the existing agricultural barn, the installation of a wastewater disposal system, upgrade of existing site entrance along with all associated site works and services. The decommissioning of existing wastewater disposal system serving the family home to the south of the proposed development and its replacement with a proposed wastewater disposal system, along with all associated site works and services
Replacement dwelling by way of the conversion of the existing agricultural building to a storey and a half style dwelling, along with the construction of a single storey extension to the rear. It will also include the renovation and conversion of the existing roadside cottage to a store, the installation of a wastewater disposal system, upgrade of existing site entrance along with all associated site works and services. The decommissioning of existing wastewater disposal system serving the family home to the south of the proposed development and its replacement with a proposed wastewater disposal system, along with all associated site works and services
1) Existing Garage - reduce the size of the existing garage, and change existing mono pitch roof to an apex roof with skylights (to match house), 2) Existing dwelling - a) demolish existing front porch and construct new porch in its place, b) extend roof on south elevation to create an overhang, install skylights in roof, modify windows on the front (east) and side (south) elevations, 3) The construction of a rear extension, to accommodate; kitchen/dining/family space, office, utility room, 4) New skylights in the new extension roof, 5) Existing site entrance to be widened and modified, 6) There will also be internal modifications to the existing dwelling and all associated site works
A porch to the front of my house
The construction of a two storey house, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works
Construction of a one and a half storey detached house with single storey element, recessed entrance, domestic garage, secondary effluent treatment system and all associated site works
The brief summarizes the pattern across all 629 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23796The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief