Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 458 decisions within 5 km, 10 exact-site or onsite candidate records, and 24 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
24 structured nearby appeal records.
24 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
Will consist of change of use from a derelict outbuilding to two, three bedroom townhouses with raised roof, new fenestration to the front and extensions to the rear with all ancillary site services
A private car park for 20 cars, associated boundary fence, lighting and vehicular access gate to Hopkin's Lane and associated site works on this site
(A)Proposed two storey prefabricated classroom extension to existing two storey prefabricated classroom structures including two storey link corridor and external fire escape staircase. (B) Installation of new standalone, single-storey prefabricated science classroom structure. (C)Installation of new standalone single-storey prefabricated toilet unit. (D) and all ancillary site development works
For change of use from a home studio (Building "A") to a one bedroom studio apartment also retention of change of use from a stable to a one bedroom studio apartment (Building "B") both for short term leasing with all associated site works all at rear garden of Hibernian House. The site is within the curtilage of a protected structure B2630 (Article 18 (d) (iii) of the regulations refer)
Construction of a two storey prefabricated building including 12 classrooms, multimedia, science lab, home economics, construction studies, general purpose hall, 7 offices, male and female toilets, and all ancillary site works, for a temporary period of five years.
For the refurbishment, alterations and extension to existing building which is a protected structure RPS. No. B26-40 for the use of the building as a Health Care Centre. The proposed alterations include: (a) The demolition of single storey extensions to the rear of the existing. (b) The construction of new part two storey part single storey extension to the rear. (c) The refurbishment and conversion of existing out-building to the rear and also permission for all ancillary site works
The brief summarizes the pattern across all 458 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23807The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief