Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 345 decisions within 5 km, 1 exact-site or onsite candidate record, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
DEVELOPMENT OF A SMALL CRAFT HARBOUR. THE PROPOSED DEVELOPMENT AT AN DAINGEAN FISHERY HARBOUR CENTRE IS LOCATED SOUTH OF THE WEST BREAKWATER AND CONSISTS OF (A) DREDGING OF AN AREA OF SEABED AND THE DISPOSAL OF THAT MATERIAL TO SEA, (B) INSTALLATION OF ANCHORING PILES FOR THE MARINA UNITS, (C) INSTALLATION OF FLOATING BREAKWATERS, SMALL CRAFT TYPE PONTOONS, WALKWAYS AND FINGERS, (D) A GANGWAY FROM THE WEST BREAKWATER TO THE SMALL CRAFT AREA, (E) TROLLEY BAYS, TOILET FACILITES, POWER AND WATER KIOSKS, (F) AND ALL ANCILLARY AND ASSOCIATED SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT. A NATURA IMPACT STATEMENT WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION.
SINGLE STOREY EXTENSION, ALTERATIONS TO EXISTING BUILDING, INSTALLATION OF PV PANELS AND INCLUDING ALL ASSOICATED SITE WORKS
TWO STOREY EXTENSION TO THE REAR OF THE ORIGINAL DWELLING
Full planning permission to A) demolish existing rear two storey extension, B) construct a new rear two storey extension onto existing dwelling house, C) construct a new single storey side extension onto existing dwelling house, D) elevation changes, internal alterations, and all associated site works.
RETAIN AN EXISTING SELF-CONTAINED LIVING UNIT ANCILLARY TO AN EXISTING DWELLING HOUSE
For ( a ) retention permission to retain existing dwelling house within revised site boundaries and ( b) full permission to ( 1) demolish existing attached boiler house, ( 2) carry out modifications / renovate existing dwelling house, (3) construct two no. single storey extensions ( to the side and to the rear ) of existing dwelling house, ( 4 ) install an external stairs to serve basement and ( 5) decommission existing septic tank and connect to existing dwelling house to the existing public sewer
The brief summarizes the pattern across all 345 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23871The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief