Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
31% of nearby decided applications were refused. The site check found 199 decisions within 5 km, 5 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
New ancillary structures relating to the operating of the existing biogas facility as follows: 1. Biofilter & Air Scrubber (including exhaust stack affixed to existing reception building at max. height of 14m above ground level). 2. LPG Tanks Compound. 3. Enclosed Flare. 4. Provision of 3 No. Storage Digestors with gas storage domes (max. height c.13m). 5. Biogas Upgrader (including Absorption Column 15.257m and a Stripper Column 12.8m). 6. Compressor. 7. Additional standby CHP 2 Enclosure. 8. LPG Boilers. 9. Carbon Filters. 10. Abstraction Sump. 11. Switch Room. 12. Vertical biofilter. 13. Co2 liquefaction plant (max. height 11.3m). 14. New bund wall around the perimeter of the site (max. 0.5m above ground level. 15. Attenuation Tank and all associated site works including decommissioning of existing lagoons and new surface water arrangements. Revised by Significant Further Information
Of modifications to an established anaerobic digestion facility as follows: 1. Modifications to gas upgrading plant consisting of: (i) Relocation of Gas Compressor within the footprint area; (ii) Externally located chillers and H2S filters; (iii) CO2 recovery and collection system enclosure. 2. Biogas Boiler enclosures and Pasteurisation Plant Biofilter Enclosure located on a mezzanine floor Plant Room No. 1. 3. Waste Compactor enclosure located at the eastern end of the reception building. 4. Solid and semi-solid biomass feedstock intake structures located at the eastern end of the reception building. 5. Biofilter enclosure at north-east corner of reception building. 6. Geomembrane Manure Storage Basin. 7. Biogas Scrubbing Vessels, storage tank and fire water store. 8. Tipping enclosure over trailer tip and liquid intake bay. 9. Enclosure extension over pasteurisation equipment
The development to be retained consists of 4 No. ancillary structures relating to the operating of the existing biogas facility as follows: (1) Biofilter (part completed); (2) Extension to the Pasteurising Enclosure to enclose the Augmented Digestate Heating Recirculating System; (3) Fire water tank; (4) Feed tank with bund and all associated site works
(A) refurbishment of existing derelict cottage complete with new natural slate roof and the restoration of existing stone walls with the insertion of new window fenestration to front (north) elevation and side (west) elevation, (B) single storey extension to Front (north) elevation and side (east) elevation and single storey extension to rear (south) elevation, (C) the installation of an Oakstown BAF wastewater treatment plant with polishing filter percolation area and (D) upgrading of existing agricultural entrance to a new vehicular recessed entrance gate and piers and all associated site works. Revised by Significant Further Information which consists of: The redline boundary has changed
The construction of a detached, single-storey dwelling; new shared vehicular entrance with and the closure of existing vehicular entrance to the adjacent house (Eircode R51 HT61); the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including wastewater treatment system and percolation area
Sought for the construction of a single storey dwelling, foul water to on site effluent treatment system and percolation area, surface water to soakaways, shared recessed vehicular entrance (which will replace the existing recessed entrance for adjacent dwelling) and all associated site works
The brief summarizes the pattern across all 199 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23894The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief