Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 371 decisions within 5 km, 2 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
An energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
An energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services
A 42m multi-user lattice telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets, a new access track and, associated site works
To retain the formation and laying of an internal roadway, weighbridge with ramps and hard surface area. Full planning permission to construct a Grain intake, drying and storage facility, to include dryers, storage shed, storage bins, weighbridges, internal road structure, upgrade existing entrance and associated site works,
To construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room.
For a 70 sq.m side extension to Industrial Unit 10 to form an Electric Vehicle Service Centre, ancillary alterations to front & side elevations, surface water to soakaways and all associated site works
The brief summarizes the pattern across all 371 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23961The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief