Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 869 decisions within 5 km, 2 exact-site or onsite candidate records, and 49 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
49 structured nearby appeal records.
49 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a two story extension to the rear of dwelling & all associated site development works deemed necessary
Development consisting of the construction of 6 no. new dwelling houses (1 no. detached, 2 no. semi-detached and a terrace of 3 no. houses), new vehicular entrances onto Pearse Road and all associated site works and services
Development consisting of communications infrastructure comprising of a 24 metre monopole structure associated equipment and cabinets, fencing and use of existing access.
Development consisting of: 1. Construction of a single storey extension to the front elevation of existing house and carry out material alterations to existing elevations. 2. Conversion of existing attached garage into habitable accommodation. 3. Reconnection to existing site services and associated site development works
Development consisting of the following: to construct a new vehicle entrance to house and build up existing entrance
Development consisting of the construction of a single storey extension to the east elevation, plus ancillary site works
The brief summarizes the pattern across all 869 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2411The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief