Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 138 decisions within 5 km, 3 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The erection of a single story dwelling, with driveway using existing road entrance, new septic tank and all associated site works
Retention Planning Permission for (I) existing garage (ii) an existing mechanical aeration tank as well as Planning Permission to install a new trench type polishing filter and all associated site works
Extension and alterations to existing dwelling along with all associated site works
The construction of a slatted shed with loose area, crush area and all associated site works
Rebuilding a 14.5 metre section of collapsed wall on the banks of the River Thonnoge and all ancillary and temporary works including the provision of temporary access ways. The proposed works will take place within the curtilage of two protected structures, St Kieran's Church and Ballylooby Community Hall. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application
A two storey dwelling, effluent treatment plant, percolation systems, combined entrance and all associated ancillary works. Previous planning ref: 17/600384
The brief summarizes the pattern across all 138 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 24273The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief