Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 215 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For renovation and modification of existing derelict dwelling house to include partial demolition of existing dwelling, construction of storey and a half extension to east of dwelling including single storey link corridor and single storey extension to south of dwelling, construction of detached garage, new wastewater treatment system and percolation area, new vehicular entrance, closing up of existing vehicular and pedestrian entrances and all ancillary site works.
Permission to construct new single-storey side and rear extensions. Demolish existing single-storey side and rear extensions to her existing dwelling; Alterations to existing single-storey front porch; Install new side entrance to her existing dwelling; Construct a new domestic garage and all associated site works
The construction of a new single storey extension to the rear and side of the existing house, changes to door and window openings on the existing house and the removal of the existing single storey annex to the western side of the existing house along with all associated site works
Development consisting of the construction of an extension to existing farm stoarage building (farm storage building previously granted permission under planning register number 14600010) together with all associated site works. The development is located within the curtilage of St. Mary's Abbey which is a PROTECTED STRUCTURE and a National Monument
Installation of a 150kWp (kilowatt-peak) solar photovoltaic (PV) energy system comprising ground-mounted solar panels, together with all associated mounting structures, cabling, electrical inverters, isolators, control equipment, security fencing and ancillary works required to connect to the existing electrical infrastructure on site. The proposed system will supplement the applicant’s current energy use and the power generated will be for Self-consumption. This development is covered by the provisions of the Renewable Energy Directive iii (Directive (EU) 2023/2413)
Demolition of farmyard outbuildings (circa 420m2), construction of a new Visitor Centre & Guesthouse which is part single and part two storey (circa 610m2) to be located within the farmyard and connected to the South of the existing Abbey Building, construction of plant and electrical rooms contained within existing farmyard outbuildings (circa 30m2),alterations to the Abbey Building (circa 65m2) to achieve accessible internal link to the new development, a new gas compound within farmyard, new underground service connections, conversion of underground tank for fire-fighting water supply with associated pumps and all ancillary services, site landscaping, new visitor parking area, retractable bollards to front of Abbey and all associated site works
The brief summarizes the pattern across all 215 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460678The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief