Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 135 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
Retain demolition works of a dwelling house that have taken place on site, retain existing two-storey dwelling as constructed on site and Planning permission to complete existing two-storey dwelling, decommission existing septic tank system on site and install a new septic tank and percolatin area and all associated site works all at Clossguire, Loughbeg Castlegregory, Co.Kerry
ALTER AND EXTEND THE EXISTING HOUSE TO THE FRONT, SIDE AND REAR AND FULL PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK SYSTEM ON SITE AND INSTALL A NEW SEPTIC TANK SYSTEM AND ALL ANCILLARY SITE WORKS
CONSTRUCT A NEW ON-SITE WASTEWATER TREATMENT SYSTEM COMPRISING OF A MECHANICAL AERATION UNIT, INTERMITTENT FILTER AND SOIL POLISHING FILTER, ALONG WITH ALL ASSOCIATED SITE WORKS ON OUR SITE
DWELLING HOUSE AND ASSOCIATED SITE WORKS
CONSTRUCT A GLAMPING SITE COMPRISING OF 5 NO. INDIVIDUAL GLAMPING UNITS AND 1 NO. SERVICE UNIT, PARKING, NEW SIGNAGE AT ENTRANCE AND ASSOCIATED SITE WORKS
CONSTRUCT 2 NO. SEMI DETACHED HOUSES
The brief summarizes the pattern across all 135 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2460748The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief